Programs / Global Adjustment
ANNUAL WINDOW

Global Adjustment — Ontario Class A

Five hours a year set your charge for the next twelve months.

~$175k – $250k per MW-year Indicative value
Ontario Jurisdiction
What it is

Global Adjustment pays for Ontario’s generation contracts. Under Class A a large customer’s share for the whole year is set by its demand during the province’s five highest peak hours. Discharge through those hours and the charge falls.

Timing

The opt-in window runs 1 to 15 June, annually.

Who qualifies
  • Ontario customer above the Class A demand threshold
  • Opt in during the annual window
  • Storage sized to hold through a full peak event
  • Peak forecasting, in-house or bought in
What it is worth
  • Roughly $175,000 to $250,000 per MW-year
  • Measured on a single peak hour, so accuracy beats capacity
  • Stacks with distribution demand charges
Watch out for
  • Global Adjustment is not a rate you can look up — it is a settled charge
  • Missing a peak hour costs a twelfth of the year’s benefit
  • The EMS has to call the hours, not react to them
The architecture that suits it

P05 — Grid Smoothing & Peak Shaving

P05  //  GRID + BESS
NO UPS
GridPCC Protanti-islandPCC BrkBESSBatt DC Protbrk + fusePCSGFLBESS BrkBMSXFMRif req.Switchboardexisting or newLoad BrkLoadsEMSAC BUScontrol / comms
Grid
BESS
PCS / Inverter
DC Protection
Breaker
Switchboard
Transformer (if required)
Protection Relay
Loads
EMS / Controller
BMS
Swipe to pan →
How we help

We size the system against your interval data and program the EMS to forecast and call the peaks rather than chase them.